George
“Mike” Juett
Lead
Scheduler, Project Controls Specialist
101 County Rd 6610, Dayton, Tx 77535
Cell: 832-725-5558 e-mail: mikejuett@yahoo.com
Summary of
Qualifications:
Over 27
years of diversified experience in the engineering, construction and
turnaround industry with special interest in project controls and computer
related application development to assist in the accurate and timely
evaluation of engineering, construction and turnaround related data.
Assignments have included new and refurbished petrochemical facilities,
paper mills, refineries and gas processing facilities. Project sizes have
ranged from $2 million to $1.2 billion and were both lump sum and cost
reimbursable. Have managed project controls teams, and interfaced with
senior management and client representatives at all levels.
Work
Experience:
WTMC – ExxonMobil, Baytown, Tx
Apr 2014 –
Jun 2014
Developed
WBS & TA Schedule, from Scope Documents & Planner step outs,
including logical sequencing of events for Multiple TA’s beginning in Sept
of 2014.
Austin
Industrials – Bayer Baytown, TX
Feb 2013-Mar
2014
Performed
schedule duties for Capital program at Bayer in Baytown, TX. Managed
multiples projects and Schedules at once while corresponding with multiple
project leads for schedule creation and updating. The following is a
detailed list of duties: Built resource loaded Level 3 schedule,
Monitored weekly schedule meetings. Updated Schedules on Weekly Basis &
Maintained 6 week look ahead schedule from P6 to manage available resources
Turner
Industries – Sinclair, Sinclair WY. Multiple Plant TA’s, Lead TA
Scheduler
Jun 2012 –
Nov 2012
Developed TA
Schedule, from Scope Documents & Planner step outs, for Multiple
TA’s. Responsible for re-evaluations of Resources, as added emergency
SD’s, from different Units, caused realignment of resources with limited
pools access. Maintained daily reports for management with emphasis
on Critical Path and scenarios of improvement. Added responsibility
included but not limited to, Manager of Planners & Change Order
Control.
SNC-Lavalin
– Invista, Orange, Tx - #7 Boiler Rebuild.
Nov 2011 – 4
Jun 2012
Responsible
for creating & implementing, as required by management, P6 structure,
“EPS, OBS, WBS, Resource, and Global Activity Codes” and reports for the
rebuild of the #7 Boiler. The Boiler was shut down after Hurricane
Ike and had been idle since then. Rebuild was extensive and required
merging Multiple contractor schedules into a master schedule and report
accordingly. Other responsibilities included but not limited to, resource
loading & updating
Willbros
Construction, Inc. Litigation Support for Construction Claims.
Mar 2011 –
Oct 2011
Willbros
Construction, Inc. When the Keystone Pipeline Pump Stations Project
was complete in February, 2011, was assigned to Litigation Support as Lead
Scheduler/Planner (Subject Matter Expert) in support of the Willbros
litigation team. Worked with outside consultants and attorneys
preparing and analyzing plans and schedules, comparing these to actual
results. Developed recommendations to mitigate damages and resolve
contract differences.
Willbros
Construction, Inc. (subsidiary of Willbros, Inc. (NYSE: WG)
Manager of Planning and Scheduling, Keystone Pipeline Project, Pump
Stations, Nebraska, Kansas and Oklahoma. Project headquarters located
in Lincoln, NE. Manager Planning and Scheduling.
Oct 2010 –
Feb 2011
Keystone
Pipeline Pump Stations Project was a multi year, in excess of $100 Million
dollar, time and material contract. There were 10 pump stations
spread from the Northern Nebraska border with South Dakota South to Ponca
City, Oklahoma. We managed over 650 craft personnel spread over the
10 pump stations, with fabrication completed in Texas and Oklahoma.
Managed all planning and scheduling across all pump stations, with planners
located at each station and progress reported daily. Interfaced
directly with Client and the client representative, Bechtel. Prepared
daily, weekly and monthly progress reports.
Turnaround
Group of Texas, Inc. TGI – a KBR Company Rayonier Performance
Fiber, Jesup, GA Lead Scheduler
2010
Created CPM
Schedule, developed job plans, assigned resource requirements, developed
logic sequencing and leveled manpower for all disciplines required for
multi unit Turnarounds. Created detailed responsibility schedules
with manpower requirements. Created and generated all reporting
functionality to Rayonier. Updated schedule as turnaround progressed
and provided critique to Rayonier management team.
Turnaround
Group of Texas, Inc. TGI – a KBR Company Rayonier Inc,
Fernandina Beach, FL Lead Scheduler
2010
Created CPM
Schedule, developed job plans, assigned resource requirements, developed
logic sequencing and leveled manpower for all disciplines required for
multi unit Turnarounds. Created detailed responsibility schedules
with manpower requirements. Created and generated all reporting
functionality to Rayonier. Updated schedule as turnaround progressed
and provided critique to Rayonier management team.
Turnaround
Group of Texas, Inc. TGI – a KBR Company LyondellBasell
Poyolefins, Laporte, Tx. Lead Scheduler
2009 – 2010
Created CPM
Schedule, developed job plans, assigned resource requirements, developed
logic sequencing and leveled manpower for all disciplines required for multi
unit Turnarounds. Created detailed responsibility schedules with
manpower requirements. Created and generated all reporting
functionality to Rayonier. Updated schedule as turnaround progressed
and provided critique to Rayonier management team
Turnaround
Group of Texas, Inc. TGI – a KBR Company Rayonier Performance
Fiber, Jesup, GA Lead Scheduler
2009
Created CPM
Schedule, developed job plans, assigned resource requirements, developed
logic sequencing and leveled manpower for all disciplines required for
multi unit Turnarounds. Created detailed responsibility schedules
with manpower requirements. Created and generated all reporting
functionality to Rayonier. Updated schedule as turnaround progressed
and provided critique to Rayonier management team.
Knowledge
and Performance, (KAP) Hovensa, St. Croix, USVI- Lead Planner/Scheduler:
2007 - 2009
Set up
scheduling standards, coding structure, and reports for $79 million Coker
Block Turnaround, which included 14 units. Worked with operations to
develop scopes for work to be accomplished and insured that the General
Contractors maintained P3 Structure, including adding/deleting
activities per Field change orders and correct manpower requirements to
determine impacts to budget and schedule. Reported to management of
schedule errors and ensured that General Contractors created recovery
schedules to maintain required finish milestones, when required.
The
Turnaround Management Co., Hovensa, St. Croix, USVI-
Planner/Scheduler:
2005 – 2007
Responsible
for setting up Progress Schedule for installation of Expander for the FCC
Unit during 2005 maintenance turnaround, already in progress. After
completion of TA duties changed to routine TA maintenance estimator,
planner/scheduler. Duties also included writing AFE’s for project as
well as writing work orders and scheduling Major Equipment for
outages. Responsible for approx 5 TA’s per year.
The
Turnaround Management Co., Valero Energy Corporation, Norco, LA -
Planner/Scheduler:
2005
Responsible
for creating & implementing, as required by management, P3e structure,
“EPS, OBS, WBS, Resource, and Global Activity Codes” and reports for a $40
million/250K mhr, 28 day outage of 17 units, to bring refinery, producing
185,000 BPD of gasoline, diesel & heating oil, up to current
specifications for a 5 year run. Other responsibilities included but not
limited to, developing work packages for field, resource loading &
updating schedule, reporting progress to management.
The
Turnaround Management Co., ExxonMobil, Joliet, IL - Planner/Scheduler:
2004 - 2005
Responsible
for coordination of contractor, operations planning effort and input into
P3e schedule for the 2003 Lo Sulfur Mogas maintenance & project
turnaround. Other responsibilities include, but not limited to, update P3e
schedule, creating progress reports, histograms and overall upkeep of P3e
schedule structure and procedures. Helped develop WBS, codes and resources
as required by project management team.
The Turnaround
Management Co., BP Refinery, Whiting, IN - Planner/Estimator:
2004
Provided a
third party analysis of an existing estimate formulated by the contractor
and validated against Gulf Coast standards for estimating. Reviewed
selected piping and boilermaker activities, formulated independent estimate
on direct field labor, based on industry standards, and provided detailed
report of findings to the client.
The
Turnaround Management Co., Celanese Chemicals, Clear Lake, TX -
Planner/Scheduler: 2003
Acted as
site lead for TTMC over as many as 12 other project controls personnel
assigned to this site. Responsible for all aspects of project controls,
including planning, estimating, scheduling, contractor selection, budgets
and reporting. Also reported to TTMC home office with regard to personnel
issues and job-related issues. Worked diligently with the client reps to
develop a workable schedule and reporting criteria.
The
Turnaround Management Co., BP, Texas City, TX - Planner/Scheduler.
2002-2003
Responsible
for planning, scheduling and updating turnaround work for multiple units as
part of BP Amoco's turnaround team. Managed the master project schedule,
and interfaced with contractors during the scheduling and execution phases
of the turnaround. Utilized Primavera software.
The
Turnaround Management Co., DuPont Packaging and Industrial Polymers Plant,
La Porte, TX, VAM Expansion TAR - Planner/Scheduler:
2001-2002
Created CPM
schedule from job scope of work. Developed job plans, assigned resource
requirements, developed logic sequencing and leveled manpower for all
disciplines. Interfaced with all sub-contractors and created detailed
responsibility schedules with manpower requirements. Created and generated
all reporting functionality to DuPont, and tracked costs incurred during
the turnaround. Updated schedule and cost as turnaround progressed and
provided critique to DuPont management team.
The
Turnaround Management Co., Conoco Refinery, Lake Charles, LA. -
Planner/Scheduler:
2001
Developed
detailed job plans from the scope of work, estimated man-hours and
developed work packages. Developed CPM schedule and all necessary reports
including craft shift schedules and management summaries. Monitored and
progressed the schedule during the execution phase of the turnaround.
Worked with all sub-contractors for optimizing the schedule and logic
sequencing.
The
Turnaround Management Co., DuPont Photopolymers, Bayport, TX. -
Planner/Scheduler: Developed and maintained
CPM schedule originated from existing job plans within the plant system.
Worked with client and sub-contractors to develop the critical path and
sequence the remaining work within the allotted time frame. Developed
custom reports for management and produced daily and weekly look-ahead
schedules for the contractors.
The
Turnaround Management Co., Phillips 66 Sweeny, TX. -
Scheduler: Developed and progressed master schedule for multiple unit
construction projects, reported schedule progress, and projected manpower
requirements. Developed detailed job plans and worked with all disciplines
on schedule optimization.
Shell, Deer
Park, Texas: Scheduler - Accountable for the
installation of new post fractionators unit and DHT unit for phase 2 of the
Maya Project. Man loaded schedule, projected manpower requirements;
reported schedule progress, formatted look ahead reports and field
personnel update reports. Integrated P3 with Oracle based progress program.
Bayer,
Baytown, Texas: Planner/Scheduler - Planned
and scheduled $2 million upgrade to coatings unit as well as multiple
subcontract tasks in several smaller turnarounds. Performed weekly audit of
work and progress of schedule, and reported directly to Bayer project
controls team.
Other
Representative Assignments
S&B, Houston,
Texas @ Amoco Oil, Mandan, North Dakota: Master Project Schedule - Joint venture with Ventech Engineers to relocate a DDU unit from
Abilene, Texas to Mandan, North Dakota. Master Project Scheduler for entire
project responsible for set-up of coding structure to integrate Ventech's
portion of project. Compiled and reported total project progress and cost.
Amoco Oil,
Texas City, Texas: Several Projects - Planner/Scheduler/Cost Engineer/
Construction Planner - prioritized and
scheduled work to be completed by subcontractors. Developed tracking system
within the P3 environment, generated progress reports, proposed schedules
and manpower curve. Implemented coding structure and tracked costs.
Developed detailed work plans and served as liaison between home office and
field.
Huntsman
Corporation, Bayport, Texas: Lead Scheduler - Maintained the master project schedule and monitored and reported
engineering and design progress.
Lyondell-Citgo
Refinery, Pasadena, Texas: Planner/Scheduler - Developed original logic network, detailed schedule, weekly
updates, coordinated with third party engineering for construction need
dates, development and implementation of detailed piping work plan on
pyramid computer system. Maintained weekly audit verification.
Shell
Refinery, Deer Park, Texas: Planner/Scheduler - Planned, scheduled and established reports depicting duration and
overall status of project, and examined alternative scenarios to enhance
completion dates.
Exxon
Chemical, Baton Rouge, Louisiana: Lead
Scheduler - Established schedule and coding structures in Open Plan
software. Implemented and maintained weekly reporting format. Developed
scheduling procedures and managed 6 schedulers.
Monsanto
Chemical, Alvin, Texas: Planner/Scheduler -
Developed original proposal and detailed schedule to repair damaged DSIDA
unit. Established graphic and text progress reports and tracked costs.
Phillips 66
Petroleum, Old Ocean, Texas: Planner/Scheduler - Developed detailed plan to rebuild desulfurization process, and
demolition and repair of damaged structure and reactors.
Arco
Refinery, Carson, California: Ordered and
received materials, backed up planners/schedulers, maintained computers and
corrected software problems.
Technical
Training:
E.T. Dunlap
- Business Major
P3e
Certified Consultant
P3e
Implementation Methodology
Software
Experience:
·
Primavera
P3
·
Primavera
P3e
·
Primavera
5 & 6
·
Microsoft
Project
·
Microsoft
Excel
·
Microsoft
Access
·
Microsoft
Word
|